FullBudget: Difference between revisions
From SpaceElevatorWiki.com
Jump to navigationJump to search
No edit summary |
|||
Line 18: | Line 18: | ||
| [[Image:SE_Financial.xls]] operational budget by Edwards | | [[Image:SE_Financial.xls]] operational budget by Edwards | ||
|- | |- | ||
| [[Image:SEcosts.doc]] | | [[Image:SEcosts.doc]] Running costs by Westling | ||
|- | |- | ||
| [[Image:SECOST1.xls]] Construction budget by Edwards | | [[Image:SECOST1.xls]] Construction budget by Edwards |
Revision as of 04:33, 14 July 2008
Full budget analysis of operations.
Working with the technical people we need a full business analysis of the capital and operational costs of the space elevator.
Specific Work
- Full cost estimate of the construction of the space elevator based on existing subsystems and similar construction projects
- Full cost estimate of the operations of the space elevator
- Based on a business model generating profits
- Based on realistic market analysis
Completed and Ongoing Efforts |
File:SE Financial.xls operational budget by Edwards |
File:SEcosts.doc Running costs by Westling |
File:SECOST1.xls Construction budget by Edwards |
File:SE Cost Breakdown.doc Explanation of construction budget by Edwards |