FullBudget: Difference between revisions
From SpaceElevatorWiki.com
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 10: | Line 10: | ||
#*Based on realistic market analysis | #*Based on realistic market analysis | ||
<issues/> | |||
<center> | <center> |
Revision as of 04:00, 17 July 2008
Full budget analysis of operations.
Working with the technical people we need a full business analysis of the capital and operational costs of the space elevator.
Specific Work
- Full cost estimate of the construction of the space elevator based on existing subsystems and similar construction projects
- Full cost estimate of the operations of the space elevator
- Based on a business model generating profits
- Based on realistic market analysis
<issues/>
Completed and Ongoing Efforts |
File:SE Financial.ods operational budget by Edwards |
File:SEcosts.odt Running costs by Westling |
File:SECOST1.ods Construction budget by Edwards |
File:SE Cost Breakdown.odt Explanation of construction budget by Edwards |