SpaceElevatorApplications: Difference between revisions
From SpaceElevatorWiki.com
Jump to navigationJump to search
m (Protected "SpaceElevatorApplications" [edit=sysop:move=sysop]) |
(Add SSP proposal) |
||
(3 intermediate revisions by 2 users not shown) | |||
Line 42: | Line 42: | ||
|width="600pt"| Status | |width="600pt"| Status | ||
|- | |- | ||
|Solar Power Satellites || Air Force write up, NASA report, JAXA Report, ESA Report, NAS Report, Kellum report | |Solar Power Satellites || Air Force write up, NASA report, JAXA Report, ESA Report, NAS Report, Kellum report [[Image:SSP-SE_Proposal.odt]] | ||
|- | |- | ||
|Lunar Base || [[Image:SE_Lunar_Program_1.odt]], [[Image:SE_Lunar.odt]] | |Lunar Base || [[Image:SE_Lunar_Program_1.odt]], [[Image:SE_Lunar.odt]] | ||
Line 69: | Line 69: | ||
|width="200pt"| Item | |width="200pt"| Item | ||
|width="400pt"| Notes | |width="400pt"| Notes | ||
|width=" | |width="300pt"| Completed and Ongoing Efforts | ||
|- | |- | ||
|Full review and independent assessment of lunar base proposal || Viability, issues, business or other rational for doing this.|| | |Full review and independent assessment of lunar base proposal || Viability, issues, business or other rational for doing this.|| | ||
*[[Image:SE_Lunar_Program_1.odt]], [[Image:SE_Lunar.odt]] Lunar base proposal by Edwards et.al. | *[[Image:SE_Lunar_Program_1.odt]], [[Image:SE_Lunar.odt]] Lunar base proposal by Edwards et.al. | ||
*[[SEApplications_1_1| Work Space #1 - Open for use]] | |||
*[[SEApplications_1_2| Work Space #2 - Open for use]] | |||
*[[SEApplications_1_3| Work Space #3 - Open for use]] | |||
|- | |- | ||
|Full review of Solar Power Satellite concept || Realistically do we need SSP? If so review and evaluate Kellum's work. Categorize potential sponsors for such a system - Japan, British Petroleum,..., also is manned presence required if so evaluate geostation viability|| | |Full review of Solar Power Satellite concept || Realistically do we need SSP? If so review and evaluate Kellum's work. Categorize potential sponsors for such a system - Japan, British Petroleum,..., also is manned presence required if so evaluate geostation viability|| | ||
Line 79: | Line 82: | ||
*[[TBD| General SSP concept by NASA]] | *[[TBD| General SSP concept by NASA]] | ||
*[[TBD| General SSP concept by the Japanese]] | *[[TBD| General SSP concept by the Japanese]] | ||
*[[SEApplications_2_1| Work Space #1 - Open for use]] | |||
*[[SEApplications_2_2| Work Space #2 - Open for use]] | |||
*[[SEApplications_2_3| Work Space #3 - Open for use]] | |||
|- | |- | ||
|Evaluate tourism potential || Based on current space tourism studies, what is the best business case for tourism with the space elevator - 8 hour trips to LEO, 24 hour trips to LEO, 3 week trips to a GEO station,...? || | |Evaluate tourism potential || Based on current space tourism studies, what is the best business case for tourism with the space elevator - 8 hour trips to LEO, 24 hour trips to LEO, 3 week trips to a GEO station,...? || | ||
*[[SEApplications_3_1| Work Space #1 - Open for use]] | |||
*[[SEApplications_3_2| Work Space #2 - Open for use]] | |||
*[[SEApplications_3_3| Work Space #3 - Open for use]] | |||
|- | |- | ||
|Evaluate long-term economic impact of a space elevator for investor/owner || How rich do owners become in various scenarios, how would an elevator affect the builder's economy (U.S., Japan, Germany, Korea, Luxembourg, Saudi Arabia, ...) || | |Evaluate long-term economic impact of a space elevator for investor/owner || How rich do owners become in various scenarios, how would an elevator affect the builder's economy (U.S., Japan, Germany, Korea, Luxembourg, Saudi Arabia, ...) || | ||
*[[SEApplications_4_1| Work Space #1 - Open for use]] | |||
*[[SEApplications_4_2| Work Space #2 - Open for use]] | |||
*[[SEApplications_4_3| Work Space #3 - Open for use]] | |||
|} | |} | ||
[[SpaceElevatorWikiOverview| Return to Overview]] | [[SpaceElevatorWikiOverview| Return to Overview]] |
Latest revision as of 06:15, 16 January 2009
Title: Applications | ||
About:
|
Tags:
|
Applications
Justification for construction of the space elevator is critical - to reason to build it and it won't be built. To this end, well defined applications are absolutely critical.
Application | Status |
Solar Power Satellites | Air Force write up, NASA report, JAXA Report, ESA Report, NAS Report, Kellum report File:SSP-SE Proposal.odt |
Lunar Base | File:SE Lunar Program 1.odt, File:SE Lunar.odt |
Mars Elevator / Base | File:Martian Elevator.odt, File:Mars cable.dxf, |
Asteroid Elevator | File:Asteroid Elevator.odt |
Geostation | Write-up of concept File:Inflatable Geodesic Sphere.odt, 3d model File:GeoStation.wrl, |
Tourism | File:ASCENTFinalReport V1.pdf, File:ASCENTFinalReport V2.pdf Futron reports |
Military | File:SE military White Paper.odt |
Spin-off technology | SpinOffTechnology |
Status
The climber has the most engineering work that needs to be done and the most opportunity for individuals and groups to get directly involved.
Work Needed
Item | Notes | Completed and Ongoing Efforts |
Full review and independent assessment of lunar base proposal | Viability, issues, business or other rational for doing this. |
|
Full review of Solar Power Satellite concept | Realistically do we need SSP? If so review and evaluate Kellum's work. Categorize potential sponsors for such a system - Japan, British Petroleum,..., also is manned presence required if so evaluate geostation viability | |
Evaluate tourism potential | Based on current space tourism studies, what is the best business case for tourism with the space elevator - 8 hour trips to LEO, 24 hour trips to LEO, 3 week trips to a GEO station,...? | |
Evaluate long-term economic impact of a space elevator for investor/owner | How rich do owners become in various scenarios, how would an elevator affect the builder's economy (U.S., Japan, Germany, Korea, Luxembourg, Saudi Arabia, ...) |