FullBudget: Difference between revisions
From SpaceElevatorWiki.com
Jump to navigationJump to search
(New page: == Full budget analysis of operations. ==) |
No edit summary |
||
(9 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
== Full budget analysis of operations. == | == Full budget analysis of operations. == | ||
Working with the technical people we need a full business analysis of the capital and operational costs of the space elevator. | |||
'''Specific Work''' | |||
#Full cost estimate of the construction of the space elevator based on existing subsystems and similar construction projects | |||
#Full cost estimate of the operations of the space elevator | |||
#*Based on a business model generating profits | |||
#*Based on realistic market analysis | |||
==Prior Efforts== | |||
{| border="1" cellpadding="2" | |||
|- | |||
|width="500pt"| [[Image:SE_Financial.ods]] operational budget by Edwards | |||
|- | |||
| [[Image:SEcosts.odt]] Running costs by Westling | |||
|- | |||
| [[Image:SECOST1.ods]] Construction budget by Edwards | |||
|- | |||
| [[Image:SE_Cost_Breakdown.odt]] Explanation of construction budget by Edwards | |||
|} | |||
==Ongoing Work== | |||
{| border="1" style="background:transparent;" | |||
|- | |||
|width="450pt"|'''[[FullBudget1|Title:Open for Use:]] ''' | |||
|width="450pt"| | |||
*Lead: Place Name Here | |||
*E-mail: Place E-mail Here | |||
*Focus: Write a brief line or two on what the page is to work on. This is so other might step up to help. | |||
|} | |||
{| border="1" style="background:transparent;" | |||
|- | |||
|width="450pt"|'''[[FullBudget2|Title:Open for Use:]] ''' | |||
|width="450pt"| | |||
*Lead: Place Name Here | |||
*E-mail: Place E-mail Here | |||
*Focus: Write a brief line or two on what the page is to work on. This is so other might step up to help. | |||
|} | |||
<issues/> |
Latest revision as of 21:45, 3 August 2008
Full budget analysis of operations.
Working with the technical people we need a full business analysis of the capital and operational costs of the space elevator.
Specific Work
- Full cost estimate of the construction of the space elevator based on existing subsystems and similar construction projects
- Full cost estimate of the operations of the space elevator
- Based on a business model generating profits
- Based on realistic market analysis
Prior Efforts
File:SE Financial.ods operational budget by Edwards |
File:SEcosts.odt Running costs by Westling |
File:SECOST1.ods Construction budget by Edwards |
File:SE Cost Breakdown.odt Explanation of construction budget by Edwards |
Ongoing Work
Title:Open for Use: |
|
Title:Open for Use: |
|
<issues/>